1930 Employment 1980: A Social History and Assessment of the Civilian Conservation Corps and the Young Adult Conservation Corps
This is a collection of essays from people who served in the CCC or YACC in Colorado during the Depression
Tags: 1930, 1980, Bureau of Reclamation, CCC, Civilian Conservation Corps, Colorado, Dust Bowl, Elk Springs, FDR, Franklin Delano Roosevelt, Ft. Logan, Grand Junction, Grand Valley Canal, Great Depression, history, Kline, Leonard Pinto, Mark Waldman, Mesa Verde, Michael McCarthy, Montrose, New Deal, Norma Stephenson, Randall Teeuwen, Redvale, Reservoir, Rimrock Road, roads, social history, The Corps, Thedford Lanier, Thomas Lyons, Uncompahgre, Uncompahgre Federal Irrigation Project, wells, YACC, Young Adult Conservation Corps
Snowy View of Embankment Slope
"Looking at downstream slope of embankment from a point in the old river channel about 600 feet downstream from axis. Slope near the crest of dam has not been graded. Note piezometer well cover at station 11+75 in center of picture."
Spillway Excavation at Vallecito Dam Site
"Looking along axis toward left abutment from right bank of spillway (Photographic point No. 1). Excavation at left foreground is for completion of cutoff wall and placing lean concrete foundation under spillway inlet channel floor."
Footing Excavation at Vallecito Dam Site
"Completed excavation for placing lean mass concrete foundation under spillway inlet wall at left side, station 5+30 to 5+84. Note key trenches excavated in rock. Embankment cut-off wall in foreground will be extended to the mass concrete. Refer to…
Hauling Earth at Vallecito Dam Construction Site
"Looking toward right abutment from station 19/50, 30 feet right of axis at the upstream No. 2 section of embankment. To the right of this section are piled the cobbles recovered from one life of embankment placed in the upstream part of No. 2 zone.…
View North of Vallecito Dam Construction
"Looking toward left abutment from right side of temporary diversion channel (135 feet upstream from axis at station 25+50). Placing compacted embankment in diversion channel in right foreground. Temporary cofferdam at left foreground."