"Dragline excavating in Borrow Pit No. 2, station 56+75/12+50. Contractor chose to make two cuts in this area. Not face of first shovel out in background."
"Looking along axis toward right abutment from station 0+00, (Photographic point No. 3). Average elevation of embankment in foreground is 7672. Refer to Pine R-383."
"Looking downstream at spillway gate structure from station 3/100, 110 feet right of centerline of spillway. (Photographic Point No. 6). Note tar paper panels for protecting concrete at right center."
"Looking at downstream slope of embankment from a point in the old river channel about 600 feet downstream from axis. Slope near the crest of dam has not been graded. Note piezometer well cover at station 11+75 in center of picture."
As part of the New Deal, the Civilian Conservation Corps (CCC) cleared the trees in the area for the Dam. The Dam itself was constructed by the United States Bureau of Reclamation.