As part of the New Deal, the Civilian Conservation Corps (CCC) cleared the trees in the area for the Dam. The Dam itself was constructed by the United States Bureau of Reclamation.
"Looking toward right abutment from station 19/50, 30 feet right of axis at the upstream No. 2 section of embankment. To the right of this section are piled the cobbles recovered from one life of embankment placed in the upstream part of No. 2 zone.…
This report is the third of three major parts to be included in a comprehensive planning study for Bayfield, Colorado. Funding was provided for the overall project by the W.K. Kellogg Foundation to the Western Colorado Rural Communities Program at…
"Completed excavation for placing lean mass concrete foundation under spillway inlet wall at left side, station 5+30 to 5+84. Note key trenches excavated in rock. Embankment cut-off wall in foreground will be extended to the mass concrete. Refer to…
"Dragline excavating in Borrow Pit No. 2, station 56+75/12+50. Contractor chose to make two cuts in this area. Not face of first shovel out in background."
This is the fifth volume in a collection of early marriages in La Plata County. The marriages in this collection date from 2 January 1930 through 31 December 1941.
This is the fourth volume in a collection of early marriages in La Plata County. The marriages in this collection date from 1 January 1922 through 31 December 1929.
This is the third volume in a collection of early marriages in La Plata County. The marriages in this collection date from 1 January 1914 through 30 December 1921.
This is the second volume in a collection of early marriages in La Plata County. The marriages in this collection date from 2 January 1902 through 24 December 1913.
This is volume 1 in a collection of early marriages in La Plata County. The marriages in this collection date from 20 October 1876 through 24 December 1901.